Enerjisa Power Generation Company put the 930 MW Bandırma Natural Gas Combined Cycle Power Plant into operation in 2010, in addition to its 4 natural gas combined cycle power plants in Kocaeli, Adana, Çanakkale and Mersin, which have a total installed power of 370 MW. Enerjisa Power Generation Company’s installed power via natural gas combined cycle power plants is 1,300 MW in total. Bandırma with an installed capacity of 930 MW Kentsa with an installed capacity of 120 MWAdana with an installed capacity of 120 MW Mersin with an installed capacity of 65 MW Çanakkale with an installed capacity of 65 MW