Enerjisa Power Generation was established in 1996 to explore new business opportunities in the energy sector and to operate as a reliable and capable supplier of energy.
The portfolio of Enerjisa Power Generation, that has rapidly grown since the year 2006, reached a total installed capacity of 1,804 MW by the end of 2012, including five natural gas combined cycle power plants operating in Kocaeli, Adana, Çanakkale, Mersin and Bandırma with a total installed capacity of 1,306 MW, various hydroelectric power plants in operation in Antalya, Mersin, Adana and Kahramanmaraş with a total installed capacity of 316 MW, and wind energy power plants operating in Balıkesir, Çanakkale, and İçel with a total installed capacity of 182 MW.
Aiming to diversify the generation portfolio, in order to create a strategic advantage, 13 hydroelectric power plants, with a total installed capacity of 1,939 MW, Tufanbeyli Thermal Power Plant, with the installed capacity of 450 MW, and wind power units, with an installed capacity of 30 MW, are currently in the design and construction stages. The portfolio of Enerjisa Power Generation reached to the total installed capacity of 4,223 MW with the licensed projects that are in operation, under construction and in the stage of engineering studies by the end of 2012. In addition to this portfolio, a natural gas power project with the installed capacity of 1,000 MW was approved for licensing. With its projects with an approximate capacity of 100 MW that are followed up, Enerjisa has already created the portfolio for reaching to the installed capacity of 5,300 MW targeted for the year 2016.
Enerjisa Power Generation makes major contributions, to Turkish electricity supply security, by ensuring that the electricity generated at its power plants are used by both the leading industrial and commercial companies of Turkey and by end user consumers through its distribution company.